AirPower Project

Audit Id 1490087920240
Title AirPower Project
Title in original language

Projekt AirPower

German

Year 2016
Subject

Business and Industry

Type

Performance

Type of performance

Performed by single SAI

Comments The Federal Ministry of Defence and Sports organised the project “AirPower 2013”, an air show presenting Austria’s air force, without the necessary approval as stipulated by the Styrian Events Act 2012 (Steiermärkisches Veranstaltungsgesetz). The responsible stakeholders failed to carry out an evaluation of AirPower 2013 with regard to its benefit for the Austrian Armed Forces, in particular against the background of the overall costs of some EUR 11.685 million. A cost-benefit analysis on the frequency of the show was lacking. The province of Styria funded AirPower 2013 with an amount of EUR 800,000 without meeting the legal requirements laid down in the Constitutional Finance Law 1948. The funds provided by the province of Styria lacked both concrete objectives and an evaluation of their impact.
Author

Austria

Materials

Audit report

German

Download report
Contact
Sabrina Vlk
eurosai@rechnungshof.gv.at
http://www.rechnungshof.gv.at
  • <fmt:message key='org.eurosai.action.EmailPage' />
  • <fmt:message key='org.eurosai.action.PdfPage' />
  • <fmt:message key='org.eurosai.action.PrintPage' />

This site is managed by EUROSAI - Legal disclaimer